91香蕉短视频下载,91香蕉视频免费看,91香蕉视频APP欲导航,91香蕉国产在线观看免费永久

当前位置:首页 / Product use Q&A

What preparations should be made for the burner before debugging?

时间:2019-01-22 点击:
1. Check whether the installation of the burner, the installation of the flue gas butterfly valve, the installation of the combined components of the pipeline, the installation of the fan duct and the installation of the control cabinet meet the requirements.
2. Whether the pipes (air duct and gas pipeline) are blown clean.
3. Check whether the lines meet wiring standards (whether the power lines and signal lines are arranged separately, and whether all the wiring is covered with number pipes).
4. Check all wiring (strong current and weak current)
5. Whether the clean instrument air is in place (pressure adjustment 0.5bar--1bar)

热点关注

网站地图91香蕉视频污下载 91香蕉视频在线下载 91香蕉APP成人污在线视看 蜜桃视频在线观看 小黄鸭福利导航 茄子影视免费黄色网站 草莓视频官网入口 好色视频M3U8